Skip to content

Product Independently confirmed2 publishers 2 min read Published

Tesla's Roadster 2 arrives six years late to a US market with nearly 90 EVs

Tesla plans to start Roadster 2 deliveries next year, six years after the car was supposed to reach driveways. Deposit holders from 2017 get a hypercar from a company its CEO now tells investors to treat as a robotics and autonomy business.

The Product Desk

How we use AI Send a correction

Photograph accompanying Tesla's Roadster 2 arrives six years late to a US market with nearly 90 EVs
Photo: wired.com
US buyers' EV choices have jumped since 2017 EVs US customers could choose from in 2017 and today, per Cox Automotive, and years since Musk announced the Roadster 2.

Cox Automotive says US customers can choose from nearly 90 EVs today, up from 15 in 2017. Separately, Musk announced the Roadster 2 almost nine years ago, in 2017.

US buyers' EV choices have jumped since 2017
FigureValueNoteClaim
EVs US customers can choose from today, nearly90 EVs16
EVs to choose from, 201715 EVs16
Since announced9 years, almost1

What happened

  • Tesla has billed Thursday night's Roadster 2 event as its last unveiling of a human-driven vehicle.
  • Wired says Musk leads the donors to the party that last year nixed EV buying incentives and last month eased fuel-economy standards so automakers can skip EVs.
  • US EV sales are shrinking, not growing, since the Trump administration reversed the country's course on electric powertrains, according to Wired.
  • Musk has suggested several times that the new Roadster will fly, and reports suggest SpaceX will help build it.

Why it matters

  • decision Deposit holders have to decide whether the car delivered next year is still the one they reserved in 2017.
  • constraint Range, charging and resale cannot sell a hypercar, so the Roadster has to win on spectacle against a speed claim others have already matched.
  • exposure The wealthy buyers the Roadster targets are also being courted by makers that keep building gas engines, so its rivals include cars that are not EVs.

Take the person who put down a $50,000 deposit in 2017, when Tesla said the car would start at $200,000 [5]. That deposit is a quarter of the base price [18]. The delivery date they were working toward has slipped six years [4].

The 2017 pitch assumed the buyer wanted to leave gasoline behind. Musk said on stage that year, "The point of doing this is to give a hardcore smackdown to gasoline cars" [2]. The carmakers who sell to this buyer are acting on the opposite assumption. Porsche and Ferrari have said they will keep developing gas engines, and Lamborghini said earlier this year it would shelve electrics altogether [13]. Some luxury makers have worked hard to imitate the sound of a V-8 in cars that do not have one [14]. Wired reports that Bugatti's CEO, who founded his own electric hypercar company, expects loud ICE cars to become a status symbol among the wealthiest buyers [15]. Those are makers' bets on buyer behavior. Wired's report includes no sales or reservation data for the Roadster itself.

The mainstream EV shopper wants something else. Stephanie Valdez Streaty, director of Industry Insights at Cox, said, "People are looking for range, performance, charging ability, resale value" [17]. Those shoppers now choose among nearly 90 EVs, up from 15 in 2017 [16]. That is close to six times as many [19]. Ed Kim, president of AutoPacific, described the hypercar end of the market differently: "EVs in this space really have to wow the shopper with a lot more than practical things" [9].

That leaves speed and spectacle to carry the sale, and the speed claim has moved. In 2017 Musk promised a then-record sub-2-second 0-to-60 time, and a handful of other production cars have since broken that barrier [10]. Shea Burns, a partner in the automotive and industrial practice at AlixPartners, said, "The laws of physics are catching up with them, outside of the rocket piece" [12].

Anyone with customers holding deposits on a late product can run a two-question test. List the reasons the customer committed. For each reason, ask whether the market still rewards it and whether the maker has shown it can deliver it. A reason that passes both stays in the pitch. One that passes the first and fails the second goes into writing with a date. One that fails the first needs a replacement before the customer asks for it. In our view, the Roadster's 2017 reasons fail the first question on Wired's evidence. Gas-engine makers are staying in the segment [13], and a sub-2-second time is no longer rare [10].

What to watch

  • Whether Tesla's Thursday event publishes a production price and acceleration figure to set against the 2017 promises of $200,000 and a sub-2-second 0-to-60.
  • Whether deliveries actually begin next year, as Tesla is slated to do.
  • Whether SpaceX hardware is part of any version of the car a customer can order.

Clarity's read

What the record supports and how the coverage leans. The claims behind it follow.

Reality

Evidence60
Adoption
Insufficient
Hype gap+55
Incentives55
Confidence62
Why these scores

Claim ledger

Ranked by verification strength, evidence, and original report placement.

  1. [1]

    Musk announced the Tesla Roadster 2 almost nine years ago, in 2017.

  2. [2]

    Musk said on stage in 2017: "The point of doing this is to give a hardcore smackdown to gasoline cars."

    Reported Supported Source: Elon Musk, quoted by Wired2 sources— create a free account to open themView cited source
  3. [3]

    On Thursday night Tesla will host what it has billed as its last unveiling event for a human-driven vehicle.

Get this ledger inside ChatGPT. Ask about any of our stories and the answer brings its figure, each claim’s verdict and the sources. Free, no account.

Add to ChatGPTAdd to Claude

Sources

2 independent publishers whose own reporting we read for this story.

  1. theverge.com

    1 article · October 14, 2026

    The Tesla Roadster could have stayed vaporware
  2. wired.com

    1 article · October 14, 2026

    Tesla’s Roadster 2 Is Late—and Entering a Different EV World

Share your take

Let Clarity write the post for you.

Signed-in readers get a short post drafted on this story in the register they choose — narrative, analytical, or a direct position — editable to the last word before it goes anywhere. The share buttons at the top of this story work without an account.

Topics and entities

Follow any of these and your For You feed starts watching them — no settings page required.

Topics

Entities

Loading related stories