Skip to content

Invest Not yet confirmed elsewhere1 publisher 3 min read Published

Samsung C&T takes 281 billion won to remodel the Mapo complex it built in 1997

Three buildings of 456 units become 482, with four extra basement levels added. The project adds only 26 units in total, so the 281 billion won bill has to land somewhere other than new sales.

The Investor · Invest desk

How we use AI Send a correction

Photograph accompanying Samsung C&T takes 281 billion won to remodel the Mapo complex it built in 1997
Photo: mk.co.kr

What happened

  • Samsung C&T's construction division won the contract to remodel the Mapo Hangang Samsung Apartments in Seoul's Mapo District, with total construction cost put at about 281 billion won, or $203 million.
  • The remodeling housing association for the complex approved Samsung C&T as its final contractor at a general meeting held on the 29th.
  • Three buildings of 456 units running from two basement levels to 28 floors become three buildings of 482 units, one of them newly built, running from six basement levels to 29 floors.
  • Community amenities including a fitness center, golf lounge and welcome lounge will total 5,824.8 square meters, which the company puts at about 12.23 square meters per household.

Why it matters

  • cost Because the payer is a body of existing owners rather than a developer with a land loan, the bill divides at roughly 616 million won a household, about $445,000, and that is the sum a general meeting voted to spend.
  • capability Samsung C&T can now sell the Raemian name twice on one address, once at handover in 1997 and again as the remodeling contractor, without the complex ever changing hands as a redevelopment site.
  • precedent Any 1990s complex a Korean major built becomes a prospect its original contractor can pitch on incumbency, which quietly reorders who starts favoured in a remodeling tender.
  • contradiction The amenity ratio reconciles with neither unit count, since 5,824.8 square meters at 12.23 per household implies about 476 households against 456 today and 482 after, so the marketing base and the build base are being counted differently.

Divide the 281 billion won of construction cost [3] by the 26 units this project actually adds, 482 where 456 stood [4][5][11], and each incremental unit is carrying about 10.8 billion won [12], which at the roughly 1,384 won to the dollar implied by the source's own 281 billion won / $203 million pairing [13] works out near $7.8 million a unit [14]. On any sale price I can imagine for a Mapo apartment, the added units are not the funding mechanism. Spread the same money across all 482 completed units instead and it falls to about 583 million won each, near $421,000 [19], which is a sane number for a rebuilt Han River flat and which locates the product: 456 homes refitted, with 26 new units and four extra basement levels layered underneath them [17].

One floor of height, 28 to 29, and four floors of depth, two to six [17], are not symmetric jobs. Putting four basement levels under a structure that has been standing since 1997 [6] is where a contract price meets a soil report, and it is the line I would want broken out before anyone calls the margin on this.

The more interesting version of the deal is the brand. Samsung C&T built this complex, is now taking it back under Raemian as Raemian La Cieler Hangang [6][7], and says this is the first time it has remodeled its own work [6]. A contractor holding a book of its own 1990s output has something closer to a callable list than a tender pipeline, because it can argue it knows the structure it is being asked to cut into.

There is another way to read this deal: as river frontage, not method. The complex faces the Han River to the southwest, sits within walking distance of Mapo Station on Line 5, and commutes to Yeouido, Gwanghwamun and Jongno [10], and the winning proposal sells permanent views, an art facade shaped after the river's waves, and a sky lounge with rooftop garden across two floors of the new building [9]. If the 281 billion won was priced off that address rather than off the remodeling method, then there is no channel here, only a postcode, and I am wrong.

Kim Myung-seok, who heads housing product marketing at Samsung C&T, framed the win as delivering pride to association members [8]. That is what you say to the people writing the cheques. What matters more is the allocation: a site team and a schedule committed to Tojeong-ro 32-gil [4] for the length of an extension-and-excavation job are not on a greenfield tower elsewhere, and a division that finds this pays will bid the next one.

What to watch

  • Whether Samsung C&T's next remodeling bid is one of its own 1990s complexes without river frontage.
  • Any revision to the 482-unit plan, which would move both the amenity ratio and the unit count members are funding.
  • Whether rival Korean majors start tendering for remodels of complexes they built themselves.

Clarity's read

What the record supports and how the coverage leans. The claims behind it follow.

Reality

Evidence34
Adoption30
Hype gap+32
Incentives78
Confidence42
Why these scores

Claim ledger

Ranked by verification strength, evidence, and original report placement.

  1. [1]

    Samsung C&T's construction division has won the contract to remodel the Mapo Hangang Samsung Apartments in Seoul's Mapo District.

    Reported Supported Source: en.sedaily.comView cited source
  2. [2]

    The remodeling housing association for the complex approved Samsung C&T as its final contractor at a general meeting on the 29th.

    Reported Supported Source: en.sedaily.comView cited source
  3. [3]

    The total construction cost of the project is about 281 billion won ($203 million).

    Reported Supported Source: en.sedaily.comView cited source

Get this ledger inside ChatGPT. Ask about any of our stories and the answer brings its figure, each claim’s verdict and the sources. Free, no account.

Add to ChatGPTAdd to Claude

Sources

1 independent publisher whose own reporting we read for this story.

  1. en.sedaily.com

    1 article · August 29, 2026

    Samsung C&T Wins Remodeling Deal for Mapo Hangang Samsung Apartments

Share your take

Let Clarity write the post for you.

Signed-in readers get a short post drafted on this story in the register they choose — narrative, analytical, or a direct position — editable to the last word before it goes anywhere. The share buttons at the top of this story work without an account.

Topics and entities

Follow any of these and your For You feed starts watching them — no settings page required.

Topics

  • Residential Brand StrategyFollow
  • Han River Waterfront HousingFollow
  • Korean Construction Contract AwardsFollow
  • Seoul Apartment RemodelingFollow

Entities

Loading related stories