Leadership1 publisher3 min readPublished
NASA will fly Starliner uncrewed again before putting astronauts aboard in mid-2028
NASA and Boeing plan an uncrewed Starliner flight in December or January, with astronauts to follow in mid-2028 if it goes well. The agency is spending that time to secure a second American crew ferry for the years after SpaceX retires Crew Dragon.
The Board Room · Leadership desk

What happened
- Starliner's 2024 crewed test, billed as a 10-day trip to the space station, lasted 286 days, and astronauts Wilmore and Williams stayed an extra six months aboard the station.
- An independent review board classified the propulsion failures as a "close call" that put the astronauts in jeopardy.
- Boeing is replacing the valves in all 12 crew module maneuvering thrusters, redesigning the service module poppets, and adding a faster flight data recorder, upgraded batteries and improved parachutes.
- SpaceX's Crew Dragon is currently the only operational U.S. spacecraft for carrying astronauts.
Compiled by The Board RoomSomething wrong?How this is made
Why it matters
- decision NASA is accepting a longer wait for its second provider so that the valve and heating fixes are proven on a flight with nobody aboard.
- exposure Until Starliner is certified, a grounding of Crew Dragon would leave the U.S. with no operational vehicle of its own for flying astronauts to the station.
- constraint A crewed debut in mid-2028 leaves Starliner at most about two and a half years of station service before the ISS's planned 2030 retirement, and less if anything slips.
The uncrewed flight is built around heat. Alongside the hardware work, Boeing says it is making operational changes to reduce the unexpected heating that contributed to the 2024 thruster problems [15]. On Starliner 1, the capsule will rendezvous and dock with the station while flight controllers exercise the thrusters and their pressurization systems [17]. "We really need to see how those thermal modifications perform on the spacecraft, and we intend to put the propulsion system through its paces," said Dana Weigel, manager of NASA's low-Earth orbit operations [19][21].
The board-deck version is short: the faults were diagnosed, the parts are being replaced, and one clean flight clears the way to certification. The skeptical reading starts with a count. Starliner 1 will be the capsule's third flight without a crew [1]. The first two both had problems, and the 2024 crewed mission launched after them anyway [9]. On that mission's approach to the station, five service module thrusters failed and the ship temporarily lost full maneuverability [12].
The reply to the skeptic is that the 2024 faults now have a diagnosis. The review board identified three major problems and a host of lesser shortcomings [20]. It tied the service module failures to Teflon poppets extruding in the propellant valves and restricting flow [12]. It also found a crew module thruster that failed on the unpiloted descent, leaving no redundancy in a critical system, and helium leaks in the pressurization plumbing [13]. The design also lacked the required redundancy in the system that fires the rocket burn to leave orbit [14]. Boeing says all of those issues are being addressed [15]. The CBS account does not say what result on Starliner 1 would clear a crew for the next flight, or what the rework costs.
NASA's reason for spending the time is supply. "It's always been the Commercial Crew Program's goal to have two crew transportation providers to ensure commercial access to low Earth orbit," Weigel said [6]. The agency wants Boeing back as soon as possible to sustain U.S. crew access to the station through its planned retirement in 2030 [4]. "Our goal is to fly Starliner One as soon as the vehicle and the team is ready," Weigel said [18].
The larger payoff comes after the station. NASA managers want an American spacecraft available for flights to commercial space stations later in the 2030s, after SpaceX phases out Crew Dragon [5]. "As SpaceX has publicly stated, the Dragon and the Falcon won't be around forever. Certifying Boeing's Starliner is important for both supporting ISS and also for follow-on future commercial destinations," Weigel said [7].
This winter's decision is narrow: whether redesigned valves and thermal changes hold through one docking [17]. Its consequence runs through a crewed flight hoped for in mid-2028 [2] and on into the commercial-station years. I think NASA has the order right on crew risk. The open question is whether a vehicle that first carries astronauts in 2028 builds enough flight history to be the second provider when those stations need one.
Boeing is pitching the work for that longer horizon. "Together with @NASA, we're making Starliner hardware enhancements and adding resources for human spaceflight certification. These changes support the spacecraft as a long-term provider of crewed missions to low Earth orbit," the company said in a post on X [8].
What to watch
- Whether Starliner 1 launches in the December-to-January window, or slips and drags the mid-2028 crewed target with it.
- How the service module thrusters and helium pressurization system perform during Starliner 1's rendezvous and docking, the systems that failed in 2024.
- Any SpaceX date for phasing out Crew Dragon, the deadline against which a certified Starliner is being measured.