Invest2 publishers3 min readPublished
Sixty-odd researchers produced 397 grades across 62 proposals, and the resulting ledger matters less for what it locks in than for the December 2029 quantum deadline now setting Ethereum's fork cadence.
The Investor · Invest desk

Compiled by The InvestorSomething wrong?How this is made
The tally closes, which is the first thing to check in a document like this: two must-ship, 15 expected to ship, eight still candidates, seven below the line but not ruled out, 28 declined and two held back for mainnet data adds to exactly 62 [1][9][10][11]. So 28 declines is 45% of the candidate set told to go away for this fork [2], and adding the seven parked below the line puts 56% of what was proposed outside Hegota unless something moves [3].
The 397 grades sound like saturation until you divide them: twelve of the sixteen contribution templates carried actual tier grades [12], blanket coverage would therefore have produced 744, and 397 is 53% of that [4]. That is deliberate, since several contributors graded only the EIPs where they held deep expertise [12], which makes the average of 6.4 grades per EIP, and the nine on the most contested items [13], a map of where attention pooled rather than a measure of consensus breadth. Geth will still publish its own standalone execution-layer list [14].
The date doing the real work here is December 2029, when the cluster wants the base layer quantum-resistant across execution, consensus and data, a target it says matches migration plans set independently by Google, Cloudflare and Microsoft [15]. Fusaka went live on December 3, 2025 [23], Glamsterdam is planned for December 2026 [18], and the cluster says reaching 2029 from there requires an average of 7.2 months per fork through a fifth upgrade it calls L* [18]. Five forks at 7.2 months is 36 months, which lands exactly on the target [6], and it is a 40% compression on the roughly twelve months between Fusaka and Glamsterdam [5]. Client teams could realistically begin Hegota implementation in late Q4 2026 [22], which is to say while Glamsterdam is still shipping [8].
So the tier list, or rather the more interesting version of it, is a schedule with grades attached: an S means the calendar bends before the scope does [4], and the calendar is anchored to a Q-day the Foundation itself calls a deliberately aggressive assumption, conceding that the most credible estimates put cryptography-breaking machines later, if they arrive at all [16]. Spending 28 declines [9] against a date you have labelled aggressive is a reasonable trade when the cost of being late is unbounded and the outside review is already booked for January 2027 [17]. The counter-read has evidence in the same document: FOCIL, filed as EIP-7805 and the one clean S in Cryptopolitan's account, is a censorship-resistance feature about getting an eligible transaction included without leaning on centralized block builders [7][8], not a post-quantum one, and the B-tier gates of prototype, sign-off and settled specification [5] test readiness rather than sequencing. If inclusion is decided by those gates, 2029 is context rather than cause.
What a builder gets from this is a grade instead of a per-team thread [2], plus a scope signal on privacy, since the cluster says that work should start in Hegota to deliver native, trustless, censorship resistant private transactions on L1 [20]. What the coverage does not yield is the identity of the second locked-in item: Cryptopolitan reports FOCIL as the only clean S [7], Cointelegraph counts two must-ship EIPs [10]. One of the two has no name yet.
Ranked by verification strength, evidence, and original report placement.
The Ethereum Foundation's Protocol cluster published a single graded ranking of every one of the 62 EIPs proposed for Hegota, the network upgrade slated to follow Glamsterdam.
It is the first time the Protocol cluster has spoken with one voice on a fork instead of leaving each team to post its own opinions, and the list is now the reference point for which features are locked in and which are on the chopping block.
The tier list was posted alongside a companion piece on cluster priorities on Monday, September 7.
Only FOCIL, filed as EIP-7805, earned a clean S grade, a unanimous top grade at full participation, described as the locked-in consensus-layer headliner.
FOCIL enables any user to get an eligible transaction included without leaning on centralized block builders.
Beyond the two headliners, the Foundation placed 15 proposals in its A-tier, eight remain candidates for inclusion, seven were placed below the line but not ruled out, and 28 were declined.
Follow any of these and your For You feed starts watching them — no settings page required.
Evidence-backed comparisons of source perspectives and observed adoption signals. Read the methodology
Which Builder, Operator, and Investor concerns the observed source mix emphasized—not a truth score.
Evidence, demonstrated adoption, hype gap, incentives, and confidence are assessed independently, each on its own current evidence. How these are measured.
Two retellings of one source
Every figure here — 62 proposals, 397 grades, the December 2029 target, the 7.2-month cadence — comes from two Ethereum Foundation posts published the same day, restated at length by Cryptopolitan and in summary by Cointelegraph. That makes the sourcing clean but singular. The one check available from outside the Foundation's own prose is arithmetic, and it holds: the two headliners, 15 A-tier, eight candidates, seven below the line, 28 declined and two unranked account for all 62 candidates. The top of the list is where the reporting frays, since the two outlets do not agree on whether one proposal or two are must-ship.
A planning artifact, not shipped code
Nothing in Hegotá exists on mainnet or in a client release. The only deployment in this reporting is Fusaka, live since December 3, 2025, whose PeerDAS is the actual capacity change users have; the tier list is a commitment document, and the Foundation itself puts the start of client implementation at late Q4 2026. Two proposals are so far from adoption that they cannot be graded until Glamsterdam produces mainnet data.
Deadline firmer than its premise
The Foundation is candid that a 2030 Q-day is a deliberately aggressive assumption, that credible estimates put cryptography-breaking machines later, and that they may never arrive — then treats December 2029 as non-negotiable until January 2027. The commitment language runs ahead of the evidence in the same document. The cadence carries the same stretch: 7.2 months per fork through L* is about 40% tighter than the twelve months between Fusaka and a December 2026 Glamsterdam, and no source shows Ethereum sustaining that. Set against the 'must ship' headlines, 45% of the submitted proposals were declined outright.
The roadmap's author grades the roadmap
The Foundation is scoring its own priorities, setting its own deadline and declaring that deadline non-negotiable, with the review that could relax it in its own hands. The grades came from teams inside the Protocol Cluster whose work the grades then fund and schedule, and Geth's exemption shows the boundary of that authority. On the reporting side, both pages carry their own pull: Cointelegraph frames the item with an ETH treasury-accumulation link and a price-target magazine plug, Cryptopolitan with a newsletter appeal and an investment disclaimer.
Firm on the counts, thin on the schedule
The list itself is solid ground, with the bands, the counts and FOCIL's placement consistently reported and internally coherent, though confidence drops as the story moves outward. The two must-ship discrepancy remains open, the 397 grades cover about half of full participation, and the December 2029 chain of reasoning -- Q-day assumption, non-negotiable date, 7.2-month cadence -- has no voice in it other than the Foundation's.
invest
Ethereum's quantum plan gets a one-way switch: draft EIP would retire BLS for good1 publisher
invest
Ethereum's 66-proposal Hegotá list is a budget, and only one line item is funded3 publishers
security
Passkey enrollment becomes a persistence trick: $10,000 kit outlives the password reset3 publishers
invest
Glamsterdam hits Plataberget on August 20, and hardcoded gas limits are the first casualty1 publisher
Publishers with included, body-backed reporting in this cluster.
1 article · September 7, 2026
1 article · September 7, 2026