build1 distinct publisher
An audit found four separate ways a resumable batch runner could believe it was done
The resume flag, the per-item state log and the lock file all shipped in the first commit on 16 March 2026, and the pipeline still could not tell finished work from missing work until an audit three months later.
Publishers:dev.to
Reality
- Evidence44
- Adoption12
- Hype gap−21
- Incentives24