product1 publisher
Photonics aims at 20 of the 400 tonnes of copper inside a 100MW data centre
Operators are betting light replaces copper between the chips inside a data centre. Whether it does turns on hall temperature and cable routing as much as on an optical cost curve that is still expensive.
Publishers:bbc.co.uk
Reality
- Evidence46
- Adoption
- Insufficient
- Hype gap+20
- Incentives80
- Confidence50