product1 distinct publisher
Two national labs studied dam retrofits with a model built by Idaho lab, estimating 15.2 TWh potential
The 15.2 terawatt-hour total is the line that travels, but the usable part is HydroGenerate, downloadable and pointed at one dam, sizing a turbine to the water an operator is already obliged to pass.
Publishers:interestingengineering.com
Reality
- Evidence45
- Adoption12
- Hype gap+28
- Incentives58