build1 publisher
Zerra DC's 2.16GW Western Downs proposal would draw near its peak around the clock
The application before Western Downs Regional Council describes a 47 gigawatt-hour-a-day load on a grid that averages 170, wired straight into the substation that exports power to Brisbane and New South Wales.
Publishers:abc.net.au
Reality
- Evidence44
- Adoption8
- Hype gap+18
- Incentives76
- Confidence48